This bidding project is called Qinghai Company Qinghai Gelmu Tumeiren 100 MW and the online photovoltaic power generation photovoltaic assembly procurement public bidding. The project bidding number is: CEZB200204769. The bidder is the Qinghai Branch of China Electric Group Co., Ltd., the source of funds is self-declared, and the bidding representative agency is China Shenhua International Engineering Co., Ltd. This project has bidding conditions and public bidding is now being made for this project.
This project adopts the full electronic bidding method.
2. Project Overview and Tendering Scope
2.1 Project Overview: Sugar baby
This project is the middle label project of the 2020 photovoltaic bid in Haixi Prefecture, Haixi Prefecture, Qinghai Province. The machine capacity is 100MWp. It is located in the south of Utumiren Photovoltaic Hot Park, Germu City, Haixi Prefecture, Qinghai Province, and directly west of Germu City. daddy‘s line distance is about 140km. The site area is unused land in Wasteland, and importantly it is Wasteland and sandy land. There is a provincial highway S303 about 14km north of the site, and it can be connected to the provincial highway S303 from the park to the destination by the planned highway in the park. It is more convenient for international traffic conditions, with an altitude of about 2970m. The total air volume of the plan is 1.745km2. The DC side installation capacity of the photovoltaic station is 100.53472MWp and the traffic side capacity is 86.45MW. The Sugar baby single crystal silicon single-face assembly is used, and the assembly power is ≥440WSugar daddy is installed in a fixed bracket method. Each 3.87MWp assembly and 3.15MVA box are changed to 1 sub-cavity, totaling 26 sub-cavity; each 26 units are connected in series with Manila escort One day, Song Wei finally remembered that he was her high school senior.Sugar daddy. At the beginning, he was in a group series, and every 18 channels were connected.1 platform series inverter, every 19 platform inverters are connected to 1 platform 3.15MVA lift box change, and the low-pressure traffic output from the inverter is raised to 35kV.
2.2 Tender scope and bidding section (package) planning: This bidding purchases 100.53472MWp photovoltaic components, the component type is a single crystal surface (all with frames) 440Wp or 445Wp. Photovoltaic components include the product body and its accessories (including cable box connection cables, MC4 plug-in heads and special items, etc.), supporting services, etc. This project contains 1 package. The bidder can only make a bid for the entire package item, and cannot make a bid based on the selection of the central area of the package.
2.3 Delivery daily date:
Planned delivery time (in batches):
On November 20, 2020, the first batch of delivery should be no less than 20MW;
On December 10, 2020, the second batch of delivery should be no less than 40MW;
On December 20, 2020, the last batch should be based on the actual delivery volume.
2.4 Delivery location: Utumiren, Germu City, Haixi Prefecture, Qinghai Province, 2020-2# block, the straight distance west of Germu City is about 140km, and the Escort manila Delivery location is about 14km north of the delivery location. Provincial Highway S303 passes through. Designated location (mountain delivery) at the construction site. In order to meet the contract delivery period or to adjust the situation of other non-buyers, the seller made Ye’s reputation dark and gradually embarked on the road of celebrities. In the end, the buyer did not bear any fees generated by this.
2.5 Escort Quality warranty period: ten years after passing and online experience.
3. Investor qualification request
3.1 Qualification requirements and professional performance request:
3.1.1 Qualification request:
(1) The bidder must be an independent legal person or other organization registered in accordance with the law and must provide useful certification documents; the bidder must be a professional manufacturer capable of implementing bidding content requests and bidding goods and services.
(2) The bidder should have a useful quality governance system Manila escort certificate, which should be provided to Sugar baby useful certificate documents.
(3) The photovoltaic component products provided by the bidder must haveCertification books such as CQC or CGC or TUV.
3Pinay escort.1.2 Industry score request: The bidder needs to supply the contractor to the month from January 2017 to the bid deadline (according to the contract time statistics signed by the contract) with a cumulative supply PV components capacity of no less than 2GW, of which: up to 2 single crystalline silicon photovoltaic components are supplied with a contract performance of 50MW or above. The bidder was required to provide a contract scanner that could prove the bidding request. She looked at her familiar actions in the contract, and Song Wei handed the cat over to her, feeling a little relieved. The scanned articles must include at most: specific item names, contract purchase and sale of two-part seal pages, and the noise and discussion. , contract term, property name number and key technical parameters and other information. Note: The financial performance of mother and son shall not be borrowed from each other.
3.2 This project does not accept joint bids.
3.3 This item does not accept representative bids.
4. Acquisition of bidding documents
4.1 Anyone who is interested in participating in the bidding must complete the registration of the National Dynamics Group supplier at the “National Sugar daddyHome Tendering Network” (http://www.chnenergybidding.com.cn). Tenders who have registered should not re-register. Please see the registration method for details. Attachment I of this notice.
4.2 PurchaseSugar babyTags: For bidders who have completed the registration, please log in to the “National Manila escortHome Power Tendering Network’s Tendering Network’s Tendering Network’s Tendering Network’s Tendering Network’s Tendering Network’s Tendering Network’s Tendering Network’s Tendering Network’s Tendering Network’s Tendering Network’s Tendering Network’s Tendering Application menu according to requests, and after the review is approved, the bidding documents will be completed online.
4.3 Buying time for bidding documents: October 15, 2020 17:00 to October 23, 2020 17:00. Potential votes that failed to obtain bid documents according to this noticeThe bidder is not allowed to participate in bidding.
4.4 The price of each set of bid documents is RMB 1,000.0 per section/insurance, and will not be refunded after sales.
5. Viewing of bidding documents and editing of bidding documents
This project uses the full electronic method to bid. The bidder must download the “National Power Bidding Network bidding document production” and related operation manuals from the bidder business system of the National Dynamic Tendering Network. The specific operation process is as follows:
5.1 The bidder logs into the National Dynamic Tendering Network’s bidder business system: http://www.chnenSugar babyergybidding.com.cn/bidhy.
5.2 Click the “Help Middle” button in the upper right corner to download “Engineering Company Tendering and Tendering System User Manual – Electronic Tag (Tendering and Tendering Manual)”.
5.3 Click the “Article Download” button in the upper right, download “National Power Tendering Network Drive Installation Pack” and “National Power Tendering Network Tag Document Production Things” in the pop-up page and install it.
Note: The bidding documents for this project are a special pattern. The bidder must complete the above operations before they can browse the bidding documents. Sugar daddy
5.4 The bidder must handle the CA digital certificate before completing the editing of the bid documents and the bidding of this project. For details on the CA digital certificate processing process, this notice is issued to Attachment II.
Note: The bidder needs to handle the CA digital certificate as soon as possible. If the CA digital certificate or CA digital certificate is not completed for the period of verification, the subsequent bidding matters will not be handled.
5.5 The bidder shall compile the bid documents in the “National Dynamic Bidding Network bid document production” in accordance with the bid documents requested. For details on the specific operation, the user’s voice of the engineering company’s bidding system is obviously not very consistent. RegisterSugar baby-Electronic Tag (Tender Manual)”. The following chapters are key chapters, pleas TC: